How to perform acceptance after the mixer is installed

The installation acceptance of various types of concrete mixers is:
(1) The fixed mixer should be installed on a firm pedestal. If it is used for a long time, the anchor bolts should be laid. If it is used for a short time, the wooden pillow should be laid under the machine and leveled and stabilized.
(2) The mobile mixer should be installed on a flat, hard floor, firmly secured with wood or a support frame, and kept horizontally. Tyres should not be used instead of supports. The use of a longer time (usually more than 3 months) Tires should be removed for safekeeping, and the ends of the axles should be cleaned and rust-proof.
(3) The transmission mechanism, working device, clutch and brake should all be fastened, flexible and reliable, and the protective cover is complete.
(4) The steel wire rope of the mixer must not be rusted, broken, or flattened. Concrete mixer installation and acceptance steps, the concrete mixer (5) on the body of the insurance hook, the hopper lifter should be intact, when the hopper rises, should be hung on the insurance hook.
(6) For the mixers that need to be excavated on the pits of hoppers, the pits should be uplifted around the pits. The bottom surface of the rails should also be compacted or the back of the tile racks should be supported with wood to prevent long working hours. Deformation.
(7) The mixer shall be provided with a rain canopy, no muddy water around the machinery, clean and tidy, and all kinds of cards are complete.
(8) The mixer should be set to "a machine, a gate, a leakage, a box" leakage protection device parameter is 30M A × 0.1S, the motor insulation resistance value should be greater than 0.5MΩ; protection of the zero line is not less than two, the console meter, instructions The signal is accurate and reliable/NewsView.asp?ID=189