DIN6923 Ss 304 Hexagon Flange Nut

Model NO.: RK-FN-01
Customized: Yes
Lead Time: 3-10 Days
Stock Products: Available
Trade Terms: EXW/Fob Zhongshan
Trademark: Rankoo
Transport Package: Box+Carton+Pallet
Specification: M1.6-M48
Origin: China
HS Code: 7318160000
Model NO.: RK-FN-01
Customized: Yes
Lead Time: 3-10 Days
Stock Products: Available
Trade Terms: EXW/Fob Zhongshan
Trademark: Rankoo
Transport Package: Box+Carton+Pallet
Specification: M1.6-M48
Origin: China
HS Code: 7318160000
DIN6923 SS 304  Hexagon Flange Nut 
Standard DIN6923
Material SS304, SS316
Specification M4.6-M48
Head shapes Round head
Screw thread Coarse thread  
Screw tip Flat point
Finish   A2-70/A2-80/A4-70/A4-80
Features Good anti-corrosion ability
Grade A2, A4
Certification ISO9001:2008, SGS, RoHS, Bureau Veritas
OEM service is also available

Product Detail
DIN6923 Ss 304 Hexagon Flange Nut


Factory Introduction
Our main factory is located in Xinghua city, Jiangsu province and has been in the fastener industry since 2002. We are the branch in Zhongshan City. In order to provide a fast service for domestic customers, we set a warehouse in Zhongshan, so our response time is within 24 hours for domestic customers. For overseas customers, we can delivery the standard fastener within 3 days, and non-standard one in 15 days. 
DIN6923 Ss 304 Hexagon Flange Nut
DIN6923 Ss 304 Hexagon Flange Nut


Package and Shipment

Our standard package is: neutral inner white box and outer carton, usually 6 pcs/box according to sizes, outer carton is 27*27*17cm. Pallet is needed if the products are too heavy. For colorful boxes, extra fee will be charged. 
DIN6923 Ss 304 Hexagon Flange Nut

DIN6923 Ss 304 Hexagon Flange Nut

FAQ
A: Are you a factory or a trader?
We are manufacturer with factory plant located in Xinghua city, Jiangsu province and we are the the branch in Zhongshan city
B: What is your MOQ?
1PC is acceptable,but only for standard products
C: Can I have my own design products?
Yes, we also offer OEM service and can provide non standard products as well.
D: How is your lead time?
For standard products, we mostly have product in stock, so we can make fast delivery. For domestic market(within 24 hours), for oversea market(within 3 days the fastest). For non-standard products or out of stock products, lead time is usually around 15 days.
E: Do you have a website, where can I see your new products?
Yes, our website is www.rankoofastener.com. You can see our new products both from here or through our website
F: Do you also produce fasteners with other material?
No, we only deal with stainless steel material.  

 
  DIN6923 SS 304  Hexagon Flange Nut 
Standard DIN6923
Material SS304, SS316
Specification M4.6-M48
Head shapes Round head
Screw thread Coarse thread  
Screw tip Flat point
Finish   A2-70/A2-80/A4-70/A4-80
Features Good anti-corrosion ability
Grade A2, A4
Certification ISO9001:2008, SGS, RoHS, Bureau Veritas
OEM service is also available

Product Detail
DIN6923 Ss 304 Hexagon Flange Nut


Factory Introduction
Our main factory is located in Xinghua city, Jiangsu province and has been in the fastener industry since 2002. We are the branch in Zhongshan City. In order to provide a fast service for domestic customers, we set a warehouse in Zhongshan, so our response time is within 24 hours for domestic customers. For overseas customers, we can delivery the standard fastener within 3 days, and non-standard one in 15 days. 
DIN6923 Ss 304 Hexagon Flange Nut
DIN6923 Ss 304 Hexagon Flange Nut


Package and Shipment

Our standard package is: neutral inner white box and outer carton, usually 6 pcs/box according to sizes, outer carton is 27*27*17cm. Pallet is needed if the products are too heavy. For colorful boxes, extra fee will be charged. 
DIN6923 Ss 304 Hexagon Flange Nut

DIN6923 Ss 304 Hexagon Flange Nut

FAQ
A: Are you a factory or a trader?
We are manufacturer with factory plant located in Xinghua city, Jiangsu province and we are the the branch in Zhongshan city
B: What is your MOQ?
1PC is acceptable,but only for standard products
C: Can I have my own design products?
Yes, we also offer OEM service and can provide non standard products as well.
D: How is your lead time?
For standard products, we mostly have product in stock, so we can make fast delivery. For domestic market(within 24 hours), for oversea market(within 3 days the fastest). For non-standard products or out of stock products, lead time is usually around 15 days.
E: Do you have a website, where can I see your new products?
Yes, our website is www.rankoofastener.com. You can see our new products both from here or through our website
F: Do you also produce fasteners with other material?
No, we only deal with stainless steel material.  

 
 

According to regulations, live birds reception should be at the wind down area of the processing plant. Including parking area, slaughtering-waiting area, unloading ,live birds hanging, stunning and bleeding area, crates cleaning, crate pelleting,vehicle disinfection area,waste store ,reception and urgent killing area and so on. The slaughterhouse is appropriate to single layer, net height is not less than 4.2 meter, the polar space not less than 6 meter, hanging area is the main workshop bleeding room design to be darkroom which separate with our working area.Close to one side to receiving area is to be working area, including clearing room, official quarantine room, if have halal products, should with one rest room for Iman.

1.Live poultry vehicles should have special road. There is a disinfection pool which same wide as door at the entrance for live poultry enter..The pool size is about 3 meters long and 100 to 150mm deep.
2. UnloadingThe platform built which height is same as vehicles which save much labor. Two workers unloading crates from vehicle,each time unload 8 to 9 layer of crate, each hour unloading 12000birds. Normally unloading platform should be keep some crates. According to WSPA regulations, when live birds reach slaughterhouse should be killed within 1hour,max. Not more than 2 hours, for one slaughterhouse which to slaughter 12000birds/H, the parking place should be suitable for 5 trucks, unloading area is suitable for 2 trucks, crates pelleting area is suitable for 3 trucks, and with spare crates storage room to keep spare crates.

3. Live birding hangingThere should be a darkroom after birds hanging and stunning, the orbit of overhead conveyor line should be kept level,straight ,try to reduce the turns and movements; The overhead conveyor line with synchronous control system and emergency stop system to ensure the reliable running of the processing line. The appropriate shackles are used according to different type of poultry and raising period; Try to keep poultry appease to prevent wings injury from struggling to ensure meat quality.



Bird Reception Machine

Live Bird Receiving Unit, Chicken Hanging Unit, Live Bird Reception, Chicken Reception

Connect Group For Poultry Project , https://www.connectpoultry.com